
Production starts at Husky Dee Valley Thermal Project
Production is underway at Husky Energy’s Dee Valley thermal project.
It is the second of six 10,000 barrel-per-day (bpd) thermal bitumen projects to come online from 2018 to 2022.
“Dee Valley is the latest in our deep portfolio of repeatable, small-scale Lloyd developments that provide low-cost, reliable feedstock for our Upgrader, asphalt refinery and U.S. refineries,” said CEO Rob Peabody said in a press release.
He said the projects have direct access to the Lloydminster refining hub and can be transported via pipeline to other markets and refineries in Canada and the United States.